提升医用门快速堆积医用门安装施工工艺
盼安医用门
2020-09-06 07:34
提升医用门快速堆积医用门安装施工工艺??盼安·品牌始创于2006年,是一家集钢质门、木质门、医用门、医院专用么、病房门、手术室门、学校门、工程门、特种门、监狱门、防辐射门、气密门、铅门、门禁、门控五金等系列产品的研发、生产、销售、服务于一体的高新技术企业,总部坐落于永康市清溪工业园。
1、技术流程
1, technological GOOGLE PRocess
划线定位→
医用门洞口处置→医用门框内灌浆→医用门框就位和暂时固定→医用门框固定→医用门框与墙体空隙的处置→整理→医用门扇装置→五金配件装置
Tre自动取款机ent and marking positioning, door, door frame, door frame and temporary fixed grouting in place, the door frame is fixed to the door frame and the wall body gap cleaning, door, hardware accessories installation
2、钢质快速医用门操作技术
2, steel fast door operation process
第一步弹线定位:按描绘需求尺度、堆积医用门标高和方向,画出医用门框框口方位线。
The first step of elastic line location: according to the requirement of design size, stacking doors elevation and direction, draw out the mouth frame position line。
第二步医用门框内灌浆:关于钢质快速医用门,需在医用门框内填充1:3水泥(材料:粉状水硬性无机胶凝材料)砂浆。填充前应先把医用门关好,将医用门扇敞开面的医用门框与医用门扇之间的防漏孔塞上塑料(结构:合成树脂、增塑剂、稳定剂、色料)盖后,方可进行填充。填充水泥不能过量,避免医用门框变形影响敞开。
The second step: steel doorframe grOUT(出局)ing for fast door, filling the
1:3 cement mortar in the doorframe. Should first close the door before the door opens filling, leak GOOGLE PRoof hole between the door frame and the surface of the plug on the plastic cover, can be filled. Filled with cement can not be excessive, to prevent deformation of open door.
第三步医用门洞口处置:装置前查看医用门洞口尺度,偏位、不笔直、不方正的要进行剔凿或抹灰处置。
病房门活动门四周装有专用橡胶封条,当门关闭时能与门框可靠帖合,保证门的气密性能。
Step third: before the installation of door opening inspection door size, deviation, not vertical, not square to chisel or plaster.
第四步堆积医用门医用门框固定:选用1.5mm厚镀锌衔接件固定。医院病房门专用控制器和脚感应开关性能优越,医护人员只需将脚伸入开关盒,自动门即能开闭,也可用手控开关操作。衔接件与墙体选用膨胀螺栓固定装置。医用门框与医用门洞墙体之间预留的装置空间:胀栓固定预留20-30mm。医用门框每边均不该少于3个衔接点。
The fourth step accumulation door fixed: adopt 1。5mm thick galvanized fixed connecting piece. The connecting piece and the wall body is fixed with bolts installed expansion. The reserved installation space between the door frame and the wall: expanding bolt fixed reserve 20-30mm. The door on each side should not less than 3 points of connection.
第五步医用门框就位和暂时固定:先拆掉医用门框下部的固定板,将医用门框用木楔暂时固定在洞口内,经校对合格后,固定木楔。医用门框埋入±0.00m标高以下20mm,须确保框口上下尺度一样,答应差错<1.5mm,对角线答应差错<2mm。
The fifth step doorcase perch and temporary fixed: fixed plate to remove the lower part of the door frame, door frame with wedge temporary fixed in the hole, the well calibrated, fixed. The door frame embedded ± 0.00m below the elevation of 20mm, must ensure the box mOUT(出局)h under the same size, the allowable error <1.5mm, diagonal error <2mm.
第六步医用门框与墙体空隙间的处置:医用门框周边缝隙,用1:2水泥砂浆嵌缝结实,应确保与墙体结成全体,经维护凝结(condensation)后,在粉刷洞口及墙体。病房门全称是医用推拉式自动门,安装在洁净室、洁净走廊、手术室及其他有洁净要求的类似场所的自动门就称为医用门。医用门框与墙体衔接处打修建密封胶。
Sixth step: the frame and the wall between the gap around the door crack, with
1:2 cement mortar caulking firmly, shall ensure that the wall to form a whole, the maintenance after solidification, to paint the hole and wall. The door frame and the wall connection hit sealant for building.